Help Sitemap Home Skip Navigation Contact Us Disability Statement

 
 
Monday, 13th October 2008

Premium Article !

Your account has been frozen. For your available options click the below button.

Options

Premium Article !

To read this article in full you must have registered and have a Premium Content Subscription with the n/a site.

Subscribe

Registered Article !

To read this article in full you must be registered with the site.

Lumiere is shelved



Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image

Published Date: 09 July 2008
Plans to Britain's tallest building outside of London brought to a halt
Building work on Lumiere - a landmark scheme to build Europe's tallest residential tower block in the heart of Leeds - has been stopped.

strong>CLICK HERE TO FIND OUT WHY LUMIERE'S DEMISE HURTS EVERYONE IN LEEDS

Property developer Kevin Linfoot today told workers to move off the £155 million Lumiere site in Wellington Street in Leeds city centre.

The move to cease construction of the two glass towers which would have soared 55 and 33 storeys above the city's skyline was blamed on the "credit crunch" which has gripped the country.

But a spokeswoman for KW Linfoot insisted the move was only temporary and that the site would not been mothballed.

She said building work would resume when economic conditions improved but could not specify a date.

Giant drills have been on the site inserting piles into the foundations to support the towers.

The spokeswoman said work on this stage has been completed.

In May a futuristic high rise tower block which was to have been the centrepiece of a £160m regeneration of the former Leeds International Pool site has was scrapped.

The 24-storey Spiracle Tower fell victim to the faltering residential property market.

The skyscraper - also known as the "Poppadom Tower" - was designed by London architects Make, whose Ken Shuttleworth is the man behind the capital's famed "gherkin" high-rise block.

In the same month the YEP reported that by juggling with millimetres ingenious architects had created dozens of extra flats in the plans for Lumiere.

Simply by reducing ceiling heights on every floor of Lumiere by just 5cm, the designers said they had managed to eke out enough space for an extra storey.

The alterations were part of a revised planning application by KW Linfoot, which included increasing the height of the buildings by around a metre so the lifts could run faster, as well as changing the blend of apartments on offer.

This would have created a total of 114 more flats, if Leeds City Council gave the revised plans the go-ahead.

The twin towers were planned to be 172m (55 storeys) and 113m (33 storeys) tall respectively, with 952 homes rather than 838.

The revised plans were submitted to the council and a decision was expected at the beginning of the month, but KW Linfoot joint managing director Richard Dean said no problems were expected.

When completed Lumiere will house around 120 serviced apartments, a covered public winter garden connecting the two towers, offices, a health centre, plus ground floor and mezzanine level retail uses and basement car parking.

Tower 1 will not only be Leeds's tallest building but Europe's tallest residential tower.

Carillion recently won the £155m contract to build Lumiere, which was scheduled to take around four years to complete.


The full article contains 472 words and appears in n/a newspaper.
Page 1 of 1

  • Last Updated: 14 July 2008 11:24 AM
  • Source: n/a
  • Location: Leeds
 
 

Comment on this Story

 

In order to post comments you must Register or Sign In

 
 
 
  

 
 


Sister Newspapers:
Press Complaints Commission

This website and its associated newspaper adheres to the Press Complaints Commission’s Code of Practice. If you have a complaint about editorial content which relates to inaccuracy or intrusion, then contact the Editor by clicking here.

If you remain dissatisfied with the response provided then you can contact the PCC by clicking here.